
GOLD DUMP RECOVERY
The project contains 3 dumps which contain a total gold reserve of over 3.1 million tonnes.
A 800 000 tonnes per year processing plant is proposed for the project that is preliminarily designed to recover gold from the ore.
The project contains 3 dumps which contain a total gold reserve of over 3.1 million tonnes.
A 800 000 tonnes per year processing plant is proposed for the project that is preliminarily designed to recover gold from the ore.